Shop drawings
Door schedule and drawings approved before production.
Architects · Consultants · Contractors
Product information and project documents for the people who draw, approve, install and maintain each opening.
Door schedules and drawings prepared for architect and fire consultant approval.
Request document 02Assembly-specific reports and labelled doors supplied for Fire NOC inspection.
Request document 03Detailed dimensions, materials and operating limits for complete doorsets.
Request document 04Door list, hardware data sheets, warranty and care instructions.
Request document 05Service visits, adjustments, spares and annual maintenance contracts.
Request documentTested to recognised standards
Fire doors are built to tested designs as per IS 3614, European Standards and British Standards, tested at CBRI. Final documentation is confirmed against the selected doorset.
Project documentation
Door schedule and drawings approved before production.
Test reports and labelled doors for Fire NOC inspection.
Written warranty on doors, hardware and installation work.
Our teams fit, adjust and test every door.
Door list, hardware data sheets and care instructions.
Service visits and annual maintenance contracts.
One project coordinator from enquiry to handover.
Matching closers, hinges, locks, handles and panic hardware.
From design to handover
A coordinated process designed to keep every stage of the project clear, precise and connected.
Discover our processDoor schedule and drawings shared for architect approval.
Doors and hardware made to approved drawings and checked.
Packed and delivered floor-wise as per site schedule.
Fixed by our own teams; closing, latching and seals tested.
Handover with documents; service and AMC after it.
Written warranty on doors, hardware and our installation work
Start your project
Share your drawings, BOQ or project requirements with our team. We'll help you identify the right door system for your project.